Whilst onsite our Project Manager Craig, and site supervisor Jordon kept in close contact with the client every step of the way. As often happens throughout a scheme, changes were requested and implemented throughout the duration without impeding the programme.
Building Interiors completed a full strip out of the existing building and installed the agreed Design & Build scheme to the high standard that HH Global required.
Weekly process meetings were held in order to show the client how the scheme was progressing .
The project was successfully delivered on time and on budget by the Building Interiors internal team.
수정됨_florida-palm-trees-on-a-sunny-day_t20_LQPX6z
The traditional outdated typical warehouse office consisted of bare block walls, limited light levels, and a very uninspiring space!
수정됨_minimal_t20_yw0WgL
Kevin Edwards chose Building Interiors to design and deliver their brand-new building in Leeds. They are a fast paced, dynamic young company and wanted their office to reflect this. The brief was to accommodate quite a lot into a relatively small space;- co-working space, wellbeing area, conference and meeting spaces, bar, games area as well as the all-important workstations for up to 40 people. It was important to them that the building be a professional space which could also be used by staff to socialise and enjoy themselves.
수정됨_minimal_t20_yw0WgL
Our client tendered this project through CBRE and we were successful in developing the concept design to a full refurbishment including M&E works, decoration, partitions, flooring, breakout areas and meeting areas including a full furniture solution.
The client really wanted an industrial look but the space was very modern. We helped achieve this look through the use of a dark colour scheme, black brick and steel finishes.
Building Interiors complied with all idea boilers rigorous health and safety requirements. Through partnering with their on-site team we successfully completed all designs and installations as required.
To be completed without interrupting the use of toilets for the office block.
수정됨_do-alto_t20_Aono9r
Refurbishment of ground floor and first floor offices including changes to the reception area. An industrial theme was adopted in places which including stripping out a suspended ceiling and utilising natural products where possible.
수정됨_the-carrot-lady_t20_3xmlnN
Amongst all standard trades this project included: Ceilings, M&E Works, partitioning, decorating, bespoke joinery and collaboration features.
수정됨_synchronicity-of-purpose_t20_XYe1yb
A lot of the details could not be determined until after the strip out phase and the features were uncovered. For this reason, the design process was ongoing on a week to week basis and heavily discussed and agreed with the client.